Is io.github.theluckystrike/change-order up? Live MCP status

It is up, behind a credential. It refused a request carrying no credential with HTTP 401, which is what a server that wants a key or a sign-in does.

It refused without a credential (HTTP 401). A check by URL makes only the initialize request, so it does not walk the OAuth discovery chain; the server's WWW-Authenticate header is in `probe.wwwAuthenticate`. If the server is in the official registry, check it by `name` to learn whether a client can get a credential unattended.

Outcomeneeds_credential
HTTP status401
Answered in503 ms
Endpoint checkedhttps://mcp.zovo.one/mcp/change-order
Checked

One MCP handshake with the listed endpoint (server/discover at 2026-07-28, then initialize for a server on the older revision), with no credential and no retry, identifying itself as agentwares-mcp-liveness/0.1 (+https://agentwares-agentcheck.vercel.app/bot). It runs when this page is requested and the result is reused for 10 minutes, so the time above is when it was taken.

Sign-in

Sign-in works, with a catch. The chain is complete, but claude.ai cannot sign in; the rest can.

First broken step: claude.ai cannot sign in, the server’s to fix (claude.com/docs connectors: authentication). claude.ai requires the protected-resource metadata's resource to equal the URL the user entered; it is https://mcp.zovo.one

Fix: Set resource to https://mcp.zovo.one/mcp/change-order. (RFC 9728 ยง3.3; MCP 2026-07-28 "Resource Parameter Implementation")

Discovery only, from the challenge this server sent the check above: no credential, no client registration. Client verdicts are emulated from each client’s published requirements. Steps, documents and redirect URIs: the full sign-in report. Watch it hourly: agentcheck's free watch checks this server every hour, follows the sign-in a new client follows with these same rules, and emails when a step breaks; no account. Nightly, with history: mcpcheck Server Pro re-runs these sign-in checks against the server every night, with 90 days of history, and emails when one fails ($49 a server a month; the first run is free).

Email me when this server changes

That was one look. To hear when it stops answering or its tools change, leave an address.

Free, no password or GitHub: one confirmation email first, then a check every hour and an email when it stops answering or its tools change. Every email has a link to stop. More about it.

Monthly census, 6 October 2026

The census sends the same request to every remote listing in the official registry once a month. On 6 October 2026 this one answered a stock client with no credential. Every listing’s result: index.ndjson (what the files hold: index.meta.json).

Agent discovery documents at this origin

A2A agent cardNot published (HTTP 404).
/.well-known/agent-card.json
MCP server card (SEP-2127)Not published (HTTP 404).
https://mcp.zovo.one/mcp/amortization/server-card (the one endpoint per origin the census asks, not this listing’s)
MCP server card (SEP-1649 location)Not published (HTTP 404).
/.well-known/mcp/server-card.json — SEP-1649, a draft superseded by SEP-2127 on 21 January 2026
Web Bot Auth key directoryNot published (HTTP 404).
/.well-known/http-message-signatures-directory

Read at https://mcp.zovo.one with the monthly census on 9 October 2026: one GET each, no credential, never a signed request. A2A against v1.0.1, the server card against the MCP Server Card schema (SEP-2127), the card at SEP-1649’s location against the shape it has, the key directory against the Web Bot Auth draft of 1 September 2026. Who publishes them.

Tool changes between snapshots

In the 2026-10 snapshot it listed 11 tools: change_order_add_line, change_order_create, change_order_delete, change_order_document, change_order_get, change_order_invoice_payload, change_order_list, change_order_status, contract_value, license_activate, license_status.

Its tools changed between 2026-09 and 2026-10:

Which tools were added or removed, and whose description or schemas changed, from content hashes in the monthly snapshots. Per tool, as JSON: /v1/drift.

The listing

Registry nameio.github.theluckystrike/change-order
DescriptionChange orders against a quote or work order: deltas, approval, running contract value.
Endpointhttps://mcp.zovo.one/mcp/change-order
Publisher repositoryhttps://github.com/theluckystrike/mcp-servers
Version0.22.0
Listing updated

Also

The full check by name, as JSON (on a 401 it also follows the OAuth discovery chain) · Watch it · Check another server · llms.txt

Free, no key, no signup. Terms · Privacy